Al Dur Waterline(1400x1200)


PROJECT : Water Transmission Pipeline

DESCRIPTION : Installation of 1400, 1200 and 800 dia Water Transmission Pipe lines from Al Dur station to West Riffa blending station the length of water line is 14.5 KM length.
Project Highlight Include:-

  • NDRC crossing at 6 places.
  • Construction of 24 Nos of various types of chambers.
  • Laying of 1320m pipeline above the ground level.